Day 58

Work continues on the eaves and the roof edge. It is only the 6th day of the shotcrete work on the eaves, which is going pretty quickly compared to the manual throwing of concrete, the style used to cement the edging of the roof. If our mason did the throwing of concrete to finish/smoothen the eaves it would have taken even longer. The only negative side to the shotcrete work is the dust that forms after the sand dries off the cement because the mix is very wet so as to allow the mixture to be sprayed. But, the work sure goes pretty fast and we use a lot less cement and sand.

By next week we hope to continue with the waterproofing of the roof.