Friday, March 6, 2015

Days 32 & 33

Putting rebar on the existing wood posts.

The rebar will connect with the roof.

Still working on the 1st layer cement and wire mesh. 

A close up of the pipe vents, the wire mesh will connect it with the main roof.

First layer of cement around the pipe vent.

View of the pipes, wire mesh, 1st layer cement and skylight.

Installed the 1st layer of wiremesh around the wood posts, the 4 rebars around it.

While they were working on these, we dealt with the stuck thatch debris on the bond beam. There were lots of dust, debris, rat nests and poop around the bond beam that we spent all day vacuuming just the 1st half of the house. We have to vacuum from the outside too as some of the debris fell on the other side of the plastic sheeting behind the mat ceiling.

No comments:

Post a Comment