Friday, February 13, 2015

Day 16 & 17


 Above is where the 1st level and 2nd level of the patio roof connects. We left about a foot extra of the wire mesh to connect with the next level.
Our mason working on the 1st layer of cement and wire mesh, he is lifting up the 2nd level of wire mesh and rebar to get to the first layer.

A close up of the plastering work.
View from our garage

 Second level patio roof connecting to the first level.
A close up of the thickness of the ferrocement. We made the thickness to about 1 3/4 inch on the bottom, it will get less thick as we go up to the top level.