This is about 2/3 of the way around the 2nd level of the main roof.
One of our workers helping out with the plasterin.
This is the finished 2/3 portion.
This is the final 1/3 of the 2nd level, they are laying on the 2 layer of wire mesh.
This is taken from the other side.